Medical Stretchers

Keyword

folding stretcher

power stair chair

stretcher chair

morgue

ked

scope strecher

height stretcher

hospital bed stretcher

virtual dissection table manufacturers

church cover

medical body bags

medical body bags

lightweight lift

scope strecher

scope strecher

scope strecher

scope strecher

battery operated chair

stairwell chair

body bag companies

body bag company

body bag company

stair lift for church

how to operate a manual hoyer lift

coffin trolley

how to use hoyer lift at home

sink foot

extrication device

extrication device

embalming machines

bodybag

bodybag

height stretcher

ez chairs

sleeping stretcher

toe tagging meaning

bod bags

what is a stretcher

stryker cot parts

disaster pouch

hard stretcher

hard stretcher

how to use a stair chair

folded aluminum

casket trolley

cabinet with a sink

ked order of straps

evac & chair

power mover

medical sinks with cabinets

medical sinks with cabinets

mourge

how to use stair chair

ked strap order

Installation Inspection Checklist




You can find the American Mortuary Cooler serial number on an orange or blue tag attached to the equipment.





We will send the Warranty Certificate to this email address.



Installation and Inspection Checklist

The purpose of this form is to aid in the installation and connection of the equipment. This form is needed along with pictures to verify equipment was installed correctly. Once the necessary documentation is received and reviewed for approval, you will be notified in writing of your warranty coverage. Some items may not pertain to your equipment and would be N/A. This form must be submitted within 30 days of final installation. If it is after 30 days, the inspection will need to be performed by American Mortuary Cooler for an additional fee.

1. Make sure nothing is obstructing the equipment on all sides and the back. (Required)

2. Verify the equipment is level. There should be no rocking or instability. (Required)

3a. If applicable, verify adjustment of the leveling feet. (Required)


3b. Upload image of air space under equipment (for Grossing Station)

4a. Verify how the power is connected to the unit. (Required)

4b. Upload image showing power connection

5. Check if the main power switch works properly. (Required)

6. Verify the GFCI breakers work properly. (Required)

7. Verify garbage disposal works properly if applicable. (Required)


8a. Verify display screen works properly if applicable. (Required)


8b. Upload image showing display screen

9a. Check plumbing connections for leaks. (Required)

9b. Upload image showing no leaks in plumbing

10a. Verify factory-installed "P" trap bracket is in place. (Required)

10b. Upload image showing "P" trap bracket

11a. Verify ventilation and band clamps connected. (Required)

11b. Upload image showing ventilation and band clamps

12a. Verify equipment is anchored correctly if applicable. (Required)


12b. Upload image showing equipment anchored

13. Verify sealing of floor-mounted/wall-mounted equipment if applicable. (Required)


14. Verify up/down elevation works properly if applicable. (Required)


15. For wall-mounted sinks, verify support brackets are bolted securely. (Required)