Delaware Affordable & Reliable Mortuary Coolers | State Compliant | American Coolers

Affordable, Reliable, and State Compliant Mortuary Equipment for Delaware

Delaware's mortuary facilities, hospital morgues, state medical examiners, and cremation facilities require equipment that is not only reliable and compliant with state regulations but also affordable. American Mortuary Coolers understands these needs and offers a range of American Made Coolers and the Nobi Line, providing cost-effective solutions without compromising quality or compliance. We also offer Mortuary Lift solutions, Quick Chill Cooler Options, and DST Cool options for all budgets.

Delaware State Compliance:

Adherence to Delaware's regulations for cadaver storage, including temperature control and sanitation, is crucial. Our American Walk-In Cooler options are designed to meet these stringent requirements, ensuring your facility remains compliant.

Reliability You Can Trust:

We prioritize reliability in all our equipment, from cadaver coolers to prep tables. Our American Made Coolers are built to last, providing long-term value and minimizing downtime.

Affordable Solutions:

We offer DST Cool options for all budgets, understanding the financial constraints many facilities face. Our goal is to provide high-quality, compliant equipment at competitive prices.

Comprehensive Equipment:

  • Cadaver Coolers & American Walk-In Coolers
  • Medical Stretchers & First Call Stretchers
  • Morgue Racks & Roller Bar Racks
  • Mortuary Lift and Cremation Lifts
  • Prep Tables & Affordable Embalming Tables
  • Quick Chill Cooler Options
  • DST Cool options for all budgets
  • Nobi Line of coolers

Serving All Delaware Facilities:

We serve all mortuary facilities, hospital morgues, state medical examiners, coroners, and cremation facilities throughout Delaware.

All Delaware Cities and Larger Towns Served:

  • Wilmington
  • Dover
  • Newark
  • Middletown
  • Smyrna
  • Milford
  • Seaford
  • Georgetown
  • Elsmere
  • New Castle

See our equipment in action! Visit our YouTube page for product demonstrations and more

Contact Information in Delaware

 

Installation Inspection Checklist




You can find the American Mortuary Cooler serial number on an orange or blue tag attached to the equipment.





We will send the Warranty Certificate to this email address.



Installation and Inspection Checklist

The purpose of this form is to aid in the installation and connection of the equipment. This form is needed along with pictures to verify equipment was installed correctly. Once the necessary documentation is received and reviewed for approval, you will be notified in writing of your warranty coverage. Some items may not pertain to your equipment and would be N/A. This form must be submitted within 30 days of final installation. If it is after 30 days, the inspection will need to be performed by American Mortuary Cooler for an additional fee.

1. Make sure nothing is obstructing the equipment on all sides and the back. (Required)

2. Verify the equipment is level. There should be no rocking or instability. (Required)

3a. If applicable, verify adjustment of the leveling feet. (Required)


3b. Upload image of air space under equipment (for Grossing Station)

4a. Verify how the power is connected to the unit. (Required)

4b. Upload image showing power connection

5. Check if the main power switch works properly. (Required)

6. Verify the GFCI breakers work properly. (Required)

7. Verify garbage disposal works properly if applicable. (Required)


8a. Verify display screen works properly if applicable. (Required)


8b. Upload image showing display screen

9a. Check plumbing connections for leaks. (Required)

9b. Upload image showing no leaks in plumbing

10a. Verify factory-installed "P" trap bracket is in place. (Required)

10b. Upload image showing "P" trap bracket

11a. Verify ventilation and band clamps connected. (Required)

11b. Upload image showing ventilation and band clamps

12a. Verify equipment is anchored correctly if applicable. (Required)


12b. Upload image showing equipment anchored

13. Verify sealing of floor-mounted/wall-mounted equipment if applicable. (Required)


14. Verify up/down elevation works properly if applicable. (Required)


15. For wall-mounted sinks, verify support brackets are bolted securely. (Required)